Feb 11th – Feb 16th – Tables + Bathroom

So, I’ve been putting this off for too long. In mid February we got a lot of work done on the bus. It was actually still kinda chilly out. High’s in the low 60’s, perfect working weather. We kept trying to find a cabinet shop that could make us custom table tops, and not a single fucking one was open. We tried calling a bunch and leaving messages. Apparently granite is cheap now and most places were only doing granite/marble counter tops. Anyways, we decided to take 2 sheets of cabinet quality 4×8’s and glue them together, sand them and screw them together from the bottom. After that trimmed to our sizes and rounded the edges. Stained and varnished both of them. We also framed out the rest of the area for the shower and got that installed, which was a new experience for both of us. Currently no grey water tank yet, so the pvc is just sticking out of the bottom. We’re not planning on using it until we have a grey water tank.

We also sewed up some covers for our beds. I ended up buying a king size foam mattress off of amazon and cutting it in half to our specs. The covers are pretty durable which should help protect the foam. You can also see the master lock that we got for the front door. It’s a pretty nifty way to do the front, we bought a garage door lock for the back.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Proudly powered by WordPress | Theme: Journey Blog by Crimson Themes.